Government Tender for Water Recharge Scheme at Vavdi Sher Talav - Civil Works Opportunity

This government tender offers a significant opportunity for civil engineering companies to participate in **water resource infrastructure development** in Gujarat. The project involves civil works for the **Water Recharge Scheme at Vavdi Sher Talav**, aimed at enhancing water conservation and management. Bidders must meet strict eligibility criteria, including valid registration, financial stability, and relevant experience. The tender process is transparent, with detailed submission procedures, evaluation criteria, and deadlines. The project duration is 6 months, with an estimated cost of approximately 25.76 lakh INR. This initiative aligns with government efforts to promote sustainable water infrastructure and environmental conservation. Qualified contractors with expertise in civil construction and water resource projects are encouraged to participate and contribute to Gujarat’s water management goals.

Works
Fee: ₹1,500
25.8 Lakh
Civil Engineering

Details

Address:New Jilla Panchayat Building By pass Road Motipura Katwad Himatnagar 383001
Start:October 9, 2025 at 03:00 PM
End:November 3, 2025 at 06:00 PM

Financial

Estimated Bid Value:₹25,76,224.00
EMD Amount:₹26,000.00
Bid Offer Validity:180 Days

Technical

Inspection Required:No

Tender Configuration

Bid Type
Service

Scope of Work

The scope of work includes the following civil construction activities for water recharge enhancement at Vavdi Sher Talav:

  • Construction of embankments and retaining walls to facilitate water retention.
  • Excavation and earthwork as per detailed specifications.
  • Installation of drainage systems to ensure proper water flow.
  • Construction of sluice gates and inlet/outlet structures.
  • Surface finishing and compaction to ensure durability.

The process involves:

  1. Site preparation and initial survey.
  2. Earth excavation and grading.
  3. Embankment and structure construction.
  4. Installation of water control infrastructure.
  5. Final surface finishing and quality checks.

Technical Specifications

The civil works must adhere to the following technical parameters:

ParameterRequirement
Material StandardsIS codes applicable for earthwork, concrete, and structural components
Structural StabilityDesigned to withstand local environmental conditions
Water TightnessEnsured through quality control and proper sealing
DurabilityMinimum 6 months project duration with provisions for maintenance
Sequential procedures include:

Financial Requirements

The estimated project cost is approximately 25,76,224 INR, with a bid security (EMD) of 26,000 INR. The financial proposal should include detailed cost breakdowns for materials, labor, machinery, and overheads. Payment will be made in accordance with the milestones achieved, as specified in the contract.

Cost ComponentEstimated Amount (INR)
Civil Works25,76,224
Bid Security (EMD)26,000
Tender Fee1,500
Bidders must submit a valid EMD FDR or exemption certificate along with their bid. Payments are to be made via electronic transfer or demand draft, with clear documentation as proof. The total bid amount should be inclusive of all taxes and duties applicable under Indian law.

Evaluation Criteria

Bids will be evaluated based on:

  • Technical compliance (40%) – adherence to specifications, methodology, and experience.
  • Financial competitiveness (30%) – lowest bid and cost-effectiveness.
  • Past experience and performance (20%) – successful completion of similar projects.
  • Compliance with eligibility criteria (10%) – proper documentation and certifications.
Scoring FactorsMax Points
Technical Proposal40
Cost Effectiveness30
Past Experience20
Eligibility & Documentation10
Minimum qualifying score is 70%. Bidders must meet all mandatory criteria to be considered for award.

Industry & Sector Information

Primary Industry

Civil Engineering

Sectors

Water Resources

Related Industries

Water Resources
Environmental Infrastructure
Construction

Target Audience

Civil engineering contractors
Water resource infrastructure companies
Construction firms specializing in water projects
Environmental infrastructure developers
Government-approved civil contractors

Tender Documents

5 Documents
BOQ Vavadi.pdfTENDER_DOCUMENT

Click to purchase access

SBD Vavdi Sher Talav.pdfTENDER_DOCUMENT

Click to purchase access

Sudharo TN13.pdfTENDER_DOCUMENT

Click to purchase access

Tender Notice No.13 of 2025-26 English.pdfTENDER_DOCUMENT

Click to purchase access

Tender Notice No.13 of 2025-26..pdfTENDER_DOCUMENT

Click to purchase access

Tender Stages

Tender Stages

stage nameevaluation dateminimum forms for submission
Preliminary Stage11-11-2025 12:000
Commercial Stage11-11-2025 12:100

Probable Bidders

Companies likely to bid
🔥 HOT
💎 PREMIUM

Ultimate Power Pack

₹499/M₹1,200
🚀 Save 58% LIMITED TIME
⏰ Grab before it ends! Only few left!

🎯 Unlimited Downloads

Download ANY tender document instantly - No limits!

Worth ₹5,000+ value

📊 AI Analytics Dashboard

Professional insights & competitor intelligence

Worth ₹2,000+ value

🎁 BONUS FEATURES

🤖 AI Analytics
🕵️ Competitor Intel
🆘 24/7 Support
⚡ Instant Access
💰 100% Money-Back Guarantee

Frequently Asked Questions

This tender aims to select qualified contractors for the Water Recharge Scheme at Vavdi Sher Talav in Gujarat, focusing on civil works that improve water conservation and management in the region.

Eligible bidders include civil engineering firms, water resource contractors, and experienced construction companies with valid registration, financial stability, and proven experience in similar projects as outlined in the eligibility criteria.

Bidders must submit valid registration certificates, solvency certificates, GST and IT documents, PAN card, affidavit, undertaking forms, EMD FDR/exemption, and other specified documents as detailed in the tender guidelines.

The last date for bid submission is 03-11-2025 at 18:00, with bids to be uploaded electronically via the official portal. Late submissions will not be accepted.

Bids will be evaluated based on technical compliance, cost, experience, and documentation, with a minimum qualifying score of 70%. The lowest evaluated bid will be awarded the contract.